web analytics

Spirit of British Columbia

Sewage Pump Ashore Controls


Client

BC Ferries

Year

New Build: 1991-1992
Custom Solution: 2012

    • Design of controls to modify existing sewage treatment system to incorporate a sewage pump to shore option based on specifications supplied by BC Ferries
    • AutoCAD drawings of modification
    • Wiring modifications to existing control panels
    • Supply and install of a custom control panel with flow meters and totalizing meter to measure sewage pumped ashore