Shore Power Upgrades

For BC Ferries

 

BC FerriesProject was broken down into 3 phases encompassing the entire ferry fleet.

Shore Power Upgrades required existing BC Ferry vessels that operated on a shore-to-ship 460-volt system be upgraded to accept 600-volt from the shore side.

With most of the vessels, the upgrades were completed after the vessel berthed for the evening.

McRae provided a turn-key solution, from Asbestos Abatement (removal or extending cables that contained asbestos material) to welding, painting, and most importantly, the supply and/or installation of all electrical related equipment, transformers, ship-to-shore panels, wireways, cabling, cable transits, and commissioning of the system.